This 1996 build has been given a modern update!! All ceiling popcorn removed throughout! Interior of house has been repainted with an accent wall upon the tiled entryway. Hardwood floors have been re-stained. New floor tile, granite, backsplash, sink, faucet, and microwave in kitchen. All four bedrooms have new carpet. Master and hall BAs have been completely updated with new floor tile, tub, walk-in shower, and double sink vanity. HVAC condenser and furnace replaced ’23. Water heater replaced ’21.